BICSI G2.1-22, ICT Outside Plant Construction and Installation

BICSI G2.1-22, ICT Outside Plant Construction and Installation: Pole Setting, Anchoring, and Guying

Yellow digger truck arm with claws clamped around wooden utility power line pole against cloudy sky with poles in background

One first needs two poles before hanging a cable span.

BICSI G2.1-22 provides instructions and installation methods for raising, anchoring, and guying poles to support OSP cable within aerial pathway. Within this 100 page standard, details are provided that cover all but the most extreme and inhospitable locations.

Table of Contents

1. Introduction

2. Scope

3. Required Standards and Documents

4. Definitions, Acronyms, Abbreviations, and Units of Measurement

5. Pole Setting

6. Attachments

7. Anchors

8. Guys

9. Grounding and Isolating Exposed Guys

10. Pole Braces

Appendix A Related Documents (Informative)

BICSI Standards G2.2-22

Sign-Up Below for a Free Preview

Print and Digital Combo

Member
$38.00

Non-Member
$47.50

Digital Only

Member
$32.00

Non-Member
$40.00

Printed Copy

Member
$32.00

Non-Member
$40.00